[phpBB Debug] PHP Warning: in file [ROOT]/includes/bbcode.php on line 112: preg_replace(): The /e modifier is no longer supported, use preg_replace_callback instead
[phpBB Debug] PHP Warning: in file [ROOT]/includes/bbcode.php on line 112: preg_replace(): The /e modifier is no longer supported, use preg_replace_callback instead
Fast Tracks • View topic - Parallel Crossing

Fast Tracks

Model Railroading Discussion Forums

Return To The Fast Tracks Website

The Fast Tracks discussion forums have been closed. Click Here for more information.

It is currently Thu Mar 28, 2024 6:47 am

All times are UTC - 5 hours [ DST ]




Forum locked This topic is locked, you cannot edit posts or make further replies.  [ 10 posts ] 
Author Message
 Post subject: Parallel Crossing
PostPosted: Wed Feb 11, 2009 9:33 pm 
Offline

Joined: Sat Aug 12, 2006 7:04 pm
Posts: 45
I have an idea to do a #6 turnout in one track of a double track main such that the diverging side of the turnout will cross the other main.
The question is what crossing angle would be needed to do this and is it available?


Top
 Profile  
 
 Post subject: Re: Parallel Crossing
PostPosted: Thu Feb 12, 2009 2:16 am 
Offline
User avatar

Joined: Sat Aug 13, 2005 10:48 am
Posts: 365
Location: East Texas - USA
It's a 1:6 crossing! Or a 9d 31' 38" angle. One can easily (I know - a relative term) hand lay such a crossing. Not likely you'll find a commercial representation.

With just a bit of eased curvature in the diverging route along with a slight widening of the parallel track center lines - you can probably get a 10 or slightly more degree crossing fitted in place. I'd actually build a curved crossing and shoot for something closer to a 12 degree approach. This gives a much safer guarding of the oblique frogs.

-ed-

_________________
-ed mccamey-
COSLAR RR - http://www.coslar.us/
NMRA Standards and Conformance Department
PROTO & FINE Scale Coordinator
I estimate I have about 5 pounds of coupler springs somewhere in the vicinity of my workbench.


Top
 Profile  
 
 Post subject: Re: Parallel Crossing
PostPosted: Fri Feb 13, 2009 9:00 pm 
Offline

Joined: Mon Aug 27, 2007 11:42 am
Posts: 17
??? hand laying a #6 crossing? why not using the double slip fixture? it's perfectly suitable, IMHO


Top
 Profile  
 
 Post subject: Re: Parallel Crossing
PostPosted: Sat Feb 14, 2009 11:24 am 
Offline
User avatar

Joined: Sat Aug 13, 2005 10:48 am
Posts: 365
Location: East Texas - USA
Each to his own. Buying a #6 double slip fixture to just build a #6 crossing is not my idea of efficiency. A crossing is not all that hard to fabricate (until you get down to less than 8 degrees (about a #7) - then you have to have moving center points).

-ed-

_________________
-ed mccamey-
COSLAR RR - http://www.coslar.us/
NMRA Standards and Conformance Department
PROTO & FINE Scale Coordinator
I estimate I have about 5 pounds of coupler springs somewhere in the vicinity of my workbench.


Last edited by emccamey on Sat Feb 14, 2009 1:21 pm, edited 1 time in total.

Top
 Profile  
 
 Post subject: Re: Parallel Crossing
PostPosted: Sat Feb 14, 2009 1:13 pm 
Offline

Joined: Mon Jul 02, 2007 10:39 am
Posts: 37
Location: Columbia, SC
Not up on all these smiley faces and stuff. [..] :) :(

Would I be correct in assuming that "IMHO" means "in my humble opinion"?

_________________
Chuck Lobaugh
cfl9280@sc.rr.com
"oldsnowtop" ... A seller of switches on eBay


Top
 Profile  
 
 Post subject: Re: Parallel Crossing
PostPosted: Sat Feb 14, 2009 1:16 pm 
Offline
User avatar

Joined: Sat Aug 13, 2005 10:48 am
Posts: 365
Location: East Texas - USA

_________________
-ed mccamey-
COSLAR RR - http://www.coslar.us/
NMRA Standards and Conformance Department
PROTO & FINE Scale Coordinator
I estimate I have about 5 pounds of coupler springs somewhere in the vicinity of my workbench.


Top
 Profile  
 
 Post subject: Re: Parallel Crossing
PostPosted: Sun Feb 15, 2009 5:59 pm 
Offline

Joined: Mon Aug 27, 2007 11:42 am
Posts: 17


Top
 Profile  
 
 Post subject: Re: Parallel Crossing
PostPosted: Sun Feb 15, 2009 11:29 pm 
Offline

Joined: Mon Jul 02, 2007 10:39 am
Posts: 37
Location: Columbia, SC
It has to do with reliability.

I constructed a #8 Double Slip (Code 83) without the center movable points, but when I put it on the test bench the trains seemed to go thru fairly well in the forward direction, but in reverse it was a disaster.

Had numeous derailments because the trucks were able to pick the center frog.

It means four (4) more points to construct, but believe me you are better off with them.

Chuck L.

_________________
Chuck Lobaugh
cfl9280@sc.rr.com
"oldsnowtop" ... A seller of switches on eBay


Top
 Profile  
 
 Post subject: Re: Parallel Crossing
PostPosted: Mon Feb 16, 2009 12:46 am 
Offline
User avatar

Joined: Sat Aug 13, 2005 10:48 am
Posts: 365
Location: East Texas - USA
Model specifications and standards are much different than the prototype. Our wider flangeways and the check gauges have much more allowance for mis-direction in complex guarded trackwork. Crossings of number 7 and above (smaller angles) will REQUIRE moving points to avoid derailing routes at the oblique ('K') frogs. If you use tighter specifications of Fine Scale or Proto Scale - you can get by with a number 8 - but beyond that you'll still need moving points. Prototype reliability can handle up to a number 9 - but even then it's a very slow order crossing unless installed with moving points. Our space constrictions requires compression - and the miniaturization doesn't have all the physics of chassis equalization that the prototypes have. Mass weight and gravity doesn't scale - also speed for various momentum requirements is not scaled (thus no need for super elevation - it's just cosmetic and can create inverse string lining). Understanding the physics and geometry of the model requirements is important for reliability. Direct scaled from prototype practice imposes scaling of the specifications (like Proto:Scales) and is not "off the shelf" modeling.

There are 'tricks' that allow better reliability - but they demand a high skill of custom track with tight specifications AND even more skill at precision chassis equalization modifications - something not for the feint of heart.

-ed-

_________________
-ed mccamey-
COSLAR RR - http://www.coslar.us/
NMRA Standards and Conformance Department
PROTO & FINE Scale Coordinator
I estimate I have about 5 pounds of coupler springs somewhere in the vicinity of my workbench.


Top
 Profile  
 
 Post subject: Re: Parallel Crossing
PostPosted: Tue Feb 17, 2009 12:00 pm 
Offline
Site Admin

Joined: Fri May 07, 2004 11:22 pm
Posts: 311
Location: Port Dover, Ontario
Hi Ed,

That was very well written and explains very eloquently the issues between prototype and modeling practice and why compromises must be made. Its all a trade off, if you want an exact duplicate of the prototype, be prepared for some challenges, but with a few compromises such as wider flanges and flange ways, we can get a workable solution that is reasonably good looking.

_________________
Cheers!

Tim Warris
Fast Tracks
http://www.fast-tracks.net
service@fast-tracks.net


Top
 Profile  
 
Display posts from previous:  Sort by  
Forum locked This topic is locked, you cannot edit posts or make further replies.  [ 10 posts ] 

All times are UTC - 5 hours [ DST ]


Who is online

Users browsing this forum: Bing [Bot] and 11 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
cron
Powered by phpBB® Forum Software © phpBB Group